Power Plant Expansion

The Client’s Needs

  • Increase in demineralized water supply to meet the plant expansion water needs
  • The site is already equipped with a two-train demineralization plant designed and built by Veolia Water Solutions & Technologies in 2006.
  • During normal operation, there is always one train in standby/regeneration. In case of peak demand, the standby train can be put into service.

Veolia Solution

  • Design, supply, delivery, installation and commissioning of an additional train of 65m³/hour demineralization system
  • Two new raw water pumps to feed the new train.


Results

  • Demineralized water specifications:
  • Organic TOC: <300 ppb
  • Conductivity: <0.2 µS/cm
  • Iron: <20 ppb
  • Silica as SiO2 : <20 ppb
  • Sodium + Potassium as CaCO3: <10ppb
  • Copper as Cu: <3 ppb

The Client

Created in 1928, it is now a world leader in transport infrastructure, power generation and transmission with a presence in more than 100 countries.