The Client’s Needs
- Increase in demineralized water supply to meet the plant expansion water needs
- The site is already equipped with a two-train demineralization plant designed and built by Veolia Water Solutions & Technologies in 2006.
- During normal operation, there is always one train in standby/regeneration. In case of peak demand, the standby train can be put into service.
Veolia Solution
- Design, supply, delivery, installation and commissioning of an additional train of 65m³/hour demineralization system
- Two new raw water pumps to feed the new train.
Results
- Demineralized water specifications:
- Organic TOC: <300 ppb
- Conductivity: <0.2 µS/cm
- Iron: <20 ppb
- Silica as SiO2 : <20 ppb
- Sodium + Potassium as CaCO3: <10ppb
- Copper as Cu: <3 ppb
The Client